220 to 390 t skid capacity for the base block
The skidding frame is rated to 220 to 390 tonnes, carrying the heavy base substructure as one block rather than hoisting it in pieces with a crane.

The rig substructure is the bottom 180 to 330 tonne block of the rig, and this skid mover is rated to shift it at 220 to 390 tonnes capacity, 10 km per hour, with 600 mm clearance on a 12,000 mm road width. Supporting legs, base crossbeams, locks and the connected hydraulic piping stay assembled through the move, so the substructure lands at the next well slot level and flat, with no secondary leveling crew. Between the mast mover's 100 to 180 tonne rating and the whole-rig carrier's 400 to 540 tonne envelope, this unit owns the base: heavy, wide and rigid, where beam twist and foundation stress are the failure modes the multi-point skidding is designed to control. It serves the standard and reinforced substructures of the 150 to 850 hp XJ workover range across -17 to 55 degree sites.
The skidding frame is rated to 220 to 390 tonnes, carrying the heavy base substructure as one block rather than hoisting it in pieces with a crane.
It moves 180 to 330 tonne rig substructures, both standard and reinforced, with adjustable fixtures set to the base size and load grade at order time.
Multi-point hydraulic skidding lifts and shifts the substructure with supporting legs, crossbeams and locks still fitted, so the base lands level and needs no post-move re-leveling crew.
A 12,000 mm road-width allowance and 600 mm clearance set the wide, low route the rigid base block requires, matching the whole-rig carrier rather than the narrower mast and auxiliary units.
The base shifts at up to 10 km per hour, controlled by closed-loop hydraulic walking so the heavy block tracks straight and settles flat at the next slot.
The thickened alloy-steel skid frame, stress-relief welded, resists torsion and bending under the substructure load, holding beam flatness through repeated skidding cycles.
| Product | Rig Substructure Moving Equipment |
|---|---|
| Product line | Rig Moving Systems |
| Basic performance | Design parameter |
|---|---|
| Max total weight of drilling rig (t) | 180~330 |
| Max moving capacity of drilling rig solid moving system (t) | 220~390 |
| Min clearance from ground (mm) | 600 |
| Max moving speed (km/h) | 10km/h |
| Width of application road (mm) | 12000 |
| Temperature of application environment(℃) | -17~55 |
For a useful technical response, include the target well conditions, operating depth or pressure, expected quantity, destination and any required configuration.
Send an InquiryAvailable configurations can be matched to the equipment model, operating conditions and project requirements.
What buyers check on the substructure moving equipment: the 180-330 t base range and the 220-390 t moving capacity.
No disassembly is needed. This equipment adopts professional integral skid moving design, supporting overall transfer of the complete rig substructure. All base frames, support legs and matching accessories remain intact, realizing zero-disassembly relocation, avoiding component loss and assembly precision deviation.
It fully matches all 150HP-850HP XJ-series workover rigs, compatible with standard light-duty, medium-duty and ultra-heavy reinforced substructure bases. The adjustable modular design ensures full-line universal adaptability and flexible matching of different base dimensions and load grades.
Yes. The mover keeps the substructure supported at multiple jacking points through the move, so the 180–330 tonne base block travels as a rigid assembly with legs, base crossbeams and hydraulic piping still connected. Rated 220–390 tonnes at up to 10 km/h with 600 mm clearance, it lands the substructure level and flat at the next well slot, which is what controls beam twist and foundation stress on the move.
A traditional move splits the substructure, lifts each section with crane and re-levels the base on arrival, which adds crane days and risks bending the base beams. This skid mover shifts the 180 to 330 tonne substructure as one block on its 220 to 390 tonne frame, at up to 10 km/h, with legs, crossbeams and locks still fitted. The base lands level at the next slot, so no second leveling crew and no beam re-alignment follow the move.
Monitoring options are tailored to the base block: load-balancing correction across the 220 to 390 tonne skidding path, real-time stress and flatness readout on the substructure frame, and remote wireless operation from a safe stand-off during the 10 km per hour shift. Because the substructure moves on 12,000 mm routes with 600 mm clearance, automatic fault alarm on the hydraulic locks and beam-deviation monitoring can be added at order time to protect the 180 to 330 tonne base from torsion during well-to-well moves.
Commercial terms are confirmed in the quotation for the exact configuration, quantity and destination.
Built to API 4F and API 7K at the Jingzhou plant under ISO 9001:2015 quality management; the skid frame is load-proved to its 220 to 390 tonne moving capacity against 180 to 330 tonne substructures before dispatch. It is set for standard or reinforced XJ-series substructures at order time, and the certificate scope is listed in the quotation.
Operation and maintenance manuals, chassis documentation and factory test reports are supplied; the hydraulic and electrical schematics are included for the client's service department.
Confirmed in the quotation according to configuration, quantity and destination.
Manuals, conventional spare parts and remote technical guidance are included; on-site commissioning and operator training can be arranged on request.
Payment schedule, Incoterms, port and packaging are agreed in the sales contract.
A recommended spare-parts list for the first operating period is provided with the quotation.
Explore nearby products to compare equipment scope before sending an inquiry.

Designed to carry a whole 300 to 480 tonne land rig without splitting it, this self-propelled moving system is rated to shift up to 400 to 540 tonnes in solid-moving configuration, with mast, drawworks, power pack and…

Where the main rig carrier moves 300 to 480 tonnes, this system moves the support side: generator-room and auxiliary skid sets of 80 to 160 tonnes, with a moving capacity of 100 to 200 tonnes on a 3-1/2 inch traction…

This carrier is purpose-built for the folded telescopic mast: 80 to 150 tonne rig masts move on a 100 to 180 tonne rated frame, at 10 km per hour, with 600 mm clearance and an 11,000 mm road-width allowance.