Fluid Supply Truck oilfield equipment
Cementing & Fracturing Equipment

Fluid Supply Truck

The support role on a cementing or fracturing spread is filled by this truck's centrifugal pump - 750 m3/h at 45 m of head - feeding clean water or fracturing fluid to where the active equipment is working. Unlike a pressure pump, it is built for bulk transfer and sustained delivery rather than injection head, and it carries a sealed, anti-corrosion tank so the fluid it moves stays clean on the way. The truck self-primes, fills rapidly and recirculates without a separate feed line, which is what keeps the blender and cementing unit supplied when the nearest water source is hundreds of metres from the wellhead.

Core advantages

Designed around the operating requirement.

750 m3/h centrifugal feed at 45 m head

The self-priming centrifugal pump is rated 750 m3/h against 45 m of head, sized to keep a cementing blender or fracturing spread supplied without throttling back as the tank level drops. One pump covers suction, fast filling and circulation on location.

Sealed anti-corrosion tank

The tank is welded from heavy plate with a multi-stage anti-corrosion lining and a sealed top, so delivered water or fracturing fluid arrives free of dust and residual contamination rather than picking up tank scale mid-job. Internal baffles keep the load settled on rough access roads.

Water and fracturing fluid service

The unit moves clean water, brine and fracturing fluid, the feed streams a cementing or fracturing crew actually needs on location, and it doubles as a circulating flushing source for wellbore cleanup. It is not rated for high-pressure injection - that is the pump truck's job.

Over-fill and static protection

Overflow protection, a pressure-relief valve, real-time level monitoring, an emergency shut-off and anti-static bonding are fitted as standard, matching oilfield safety rules for fluid transport rather than road-tank practice. The working platform is non-slip for hose handling on site.

All-terrain field access

Ride height, suspension and tire sizing are set for soft sand, mud-season tracks and uneven well pads that an ordinary road tank truck cannot reach, which is how it services remote cluster wells without a grader-built road. Weight distribution keeps the laden tank stable on slopes.

One-unit fluid logistics

Storage, transport and rapid supply are combined on a single chassis, replacing a queue of bowsers and manual hosing at the pad. Fewer support vehicles means less crew time and less coordination overhead per cementing stage.

Product Overview
ProductFluid Supply Truck
Product lineCementing & Fracturing Equipment
Technical Specifications
Centrifuge pump displacement750(m3/h)
Pumping head45(m)
Working mediumWater, fracturing fluid
Application

Where this equipment is used.

  • Bulk transfer of clean water and fracturing fluid to the blender and cementing unit, sustained by the 750 m³/h centrifugal pump at 45 m head.
  • Self-priming fill and recirculation without a separate feed line on location.
  • Keeping the active spread supplied during continuous cementing and fracturing jobs.
  • Rapid redeployment between pads on the truck-mounted chassis.
  • Feed duties where bulk delivery rather than injection head decides the unit.
Next step

Send the operating requirement.

For a useful technical response, include the target well conditions, operating depth or pressure, expected quantity, destination and any required configuration.

Send an Inquiry
Configuration

Options for a matched equipment scope.

Available configurations can be matched to the equipment model, operating conditions and project requirements.

  • Flow rating: 750 m³/h at 45 m head confirmed against the spread demand.
  • Tank: sealed anti-corrosion tank volume and material matched to the working fluid.
  • Feed and recirculation: suction, discharge and recirculation arrangement confirmed against the blender position.
  • Chassis: truck-mounted fitment with road and permit requirements confirmed for the region.
  • The Fluid Supply Truck climate package covers low-temperature start, heat preservation and coating, matched to the operating site.
  • Support package for Fluid Supply Truck: manuals, factory test report and first-period spares; commissioning and crew training confirmed at order time.
Buyer questions

Frequently asked about this equipment.

Questions about the fluid supply truck start with the 750 m3/h rating, head and winter operation provisions.

What is the main function of a Fluid Supply Truck in oilfield operation?

It integrates liquid storage, long-distance transportation and on-site rapid supply functions, specially used for supporting liquid supply for oilfield cementing, fracturing, well flushing and well maintenance. It solves the problem of insufficient on-site liquid reserve and discontinuous supply, ensuring continuous and stable oilfield construction.

What types of oilfield liquids can this equipment transport and supply?

It is compatible with multiple conventional oilfield working media, including construction clean water, brine, cementing mixing water, fracturing base fluid and other non-corrosive industrial liquids. The tank anti-corrosion grade can be customized for special medium adaptation.

Can it adapt to complex and harsh oilfield road conditions?

Yes. The truck rides a heavy off-road chassis sized for muddy, sandy and seasonal mountain access, with the tire and suspension matched to unpaved well-pad roads. It reaches remote locations where a standard on-road truck cannot, which matters on scattered fields where the road ends before the well.

Does the equipment support low-temperature winter operation?

Yes. The truck is specified for year-round field service, with the tank and fluid path arranged so water or fracturing fluid is delivered clean in winter operation; optional heat preservation and heating devices are available where pipelines and tanks must be kept above freezing. Confirm the site winter temperature band in the inquiry so the winterising scope is priced explicitly.

Can the capacity and working parameters be customized?

Yes. The configuration is settled against the cementing or fracturing spread before the order: tank volume, delivery rate around the 750 m3/h and 45 m head centrifugal pump, tank material and anti-corrosion grade, and the heat-preservation package are matched to the working medium, spread size and winter site conditions, then written into the quotation and the factory test report.

Procurement information

Ordering this equipment.

Commercial terms are confirmed in the quotation for the exact configuration, quantity and destination.

Certification & standards

Built to API oilfield equipment standards at the Jingzhou plant under ISO 9001:2015 quality management, the fluid tanks, pumping lines and valves are pressure-tested at the factory; seals, couplings and unloading points are checked before shipment, and test reports are supplied with the unit.

Documentation

Operation and maintenance manuals, chassis documentation and factory test reports are supplied; the hydraulic and electrical schematics are included for the client's service department.

Lead time

Confirmed in the quotation according to configuration, quantity and destination.

Warranty & after-sales

Manuals, conventional spare parts and remote technical guidance are included; on-site commissioning and operator training can be arranged on request.

Payment & delivery

Payment schedule, Incoterms, port and packaging are agreed in the sales contract.

Spare parts

A recommended spare-parts list for the first operating period is provided with the quotation.