350HP Truck-Mounted Workover Rig oilfield equipment
Drilling Rigs

350HP Truck Mounted Rigs

Badged ZYT5502TZJ, this truck-mounted workover rig is defined by a 1125 kN maximum load on a 4x5 traveling system, eight lines of 26 mm (1-inch) wire pulled to a 210 kN fast-line pull, under a 32 m clearance mast. A CAT C15 drives an Allison M5620AR transmission, and on 4 1/2-inch drill pipe the unit drills to 1000 m. It sits between the shallow workover class and the deep-service machines: enough mast, line and power for medium-depth drilling plus heavier workover, still on a self-propelled carrier that relocates between sites without trailers. The 1.4 m/s hoisting speed keeps trips moving when the job mixes drilling with completion and repair work rather than running a single string all day.

Core advantages

Designed around the operating requirement.

Product-specific advantages depend on the selected model and configuration. Contact our technical team for a matched review.

Product Overview
Product350HP Truck Mounted Rigs
Product lineDrilling Rigs
Technical Specifications
ModelZYT5502TZJ
Drill depth (4 1/2” DP) m1000
Max fast line pull KN210
Max load KN1125
Drill line diameter mm (in)/effective number nΦ26 (1") /8
Mast hoisting speed m/s1.4
Traveling system type4×5
EngineCAT C15
TransmissionALLISION M5620AR
clearance height of mast m32m
Application

Where this equipment is used.

  • This truck-mounted workover rig drills to 1000 m on 4-1/2 in drill pipe and handles medium-depth workover on the same carrier, with a 1125 kN maximum load.
  • Completion and repair programmes where the 4×5 traveling system, Φ26 mm eight-line train and 210 kN fast-line pull handle mixed strings.
  • Medium-depth drilling, geothermal and water-well work where the 32 m mast and CAT C15 / Allison M5620AR package carry the duty.
  • Frequent site moves between dispersed pads: the unit relocates without trailers, keeping trips moving at 1.4 m/s.
  • Well service in hilly and remote areas where a lighter carrier than the deep fleet is enough.
  • Site conditions in desert, Gobi and high-altitude regions are addressed by the 350HP Truck Mounted Rigs climate and coating configuration.
Next step

Send the operating requirement.

For a useful technical response, include the target well conditions, operating depth or pressure, expected quantity, destination and any required configuration.

Send an Inquiry
Configuration

Options for a matched equipment scope.

Available configurations can be matched to the equipment model, operating conditions and project requirements.

  • Hook and hoist margin: confirm the 1125 kN maximum rating, 4×5 arrangement and 32 m mast against the planned strings.
  • Drilling scope: confirm the 1000 m drilling rating and circulating equipment if the rig will drill before workover.
  • Power train: CAT C15 / Allison M5620AR is the reference; emission and transmission options can be discussed.
  • Well-control fit: BOP stack and floor layout matched to the 32 m mast clearance.
  • Documents and after-sales for 350HP Truck Mounted Rigs: operation manuals, factory test report and first-period spares are included; on-site commissioning and crew training can be arranged.
Buyer questions

Frequently asked about this equipment.

What buyers check on the 350HP truck-mounted rigs: the 4,000 m envelope, 900 kN hook and 10×8 all-terrain chassis.

What can the 350HP truck-mounted workover rig drill and service?

Badged ZYT5502TZJ, the unit drills to 1000 m on 4 1/2-inch drill pipe and handles medium-depth workover on the same carrier, with a 1125 kN maximum load on a 4×5 traveling system, eight lines of 26 mm wire and a 210 kN fast-line pull. It sits between the shallow workover class and the deep-service fleet.

How does the 350 hp rig relocate between sites?

The rig moves as one self-propelled unit: the 32 m mast folds, the carrier is part of the package, and no trailers or cranes are needed for routine site changes. The 1.4 m/s hoisting speed keeps trips moving when the job mixes drilling with completion and repair work.

Is the 350 hp package customizable for specific wells?

Yes. Mast clearance, line arrangement, hook margin and the CAT C15 / Allison M5620AR power match can be adjusted at order time against the planned well depth and strings. State the target depth, casing programme and operating region in the inquiry.

What operating conditions is the 32 m mast and drivetrain built for?

The reinforced 32 m mast and C15/M5620AR package carry medium-depth drilling, geothermal and water-well work, plus heavier workover where the shallow class runs out of mast and line. Desert, Gobi and high-altitude sites are covered by the climate and coating configuration.

What support ships with the rig?

Manuals, the factory test report and a first-period spare list are supplied, with remote technical guidance included. On-site commissioning and operator training can be arranged for first-time crews.

Procurement information

Ordering this equipment.

Commercial terms are confirmed in the quotation for the exact configuration, quantity and destination.

Certification & standards

Built to API 4F at the Jingzhou plant under ISO 9001:2015 quality management, the truck-mounted rig derrick is load-tested to its rated hook load and the self-propelled chassis drivetrain run in at the factory; full test reports are supplied with the quotation.

Documentation

Operation manuals, chassis documentation and factory test reports are supplied; the PTO and hydraulic system schematics are included for the client's service department. On-site commissioning is available.

Lead time

Confirmed in the quotation according to configuration, quantity and destination.

Warranty & after-sales

Manuals, conventional spare parts and remote technical guidance are included; on-site commissioning and operator training can be arranged on request.

Payment & delivery

Payment schedule, Incoterms, port and packaging are agreed in the sales contract.

Spare parts

A recommended spare-parts list for the first operating period is provided with the quotation.