1500HP Skid Mounted Rig (ZJ50D) oilfield equipment
Drilling Rigs

1500HP Skid Mounted Rig (ZJ50D)

The ZJ50D takes the skid line into the 5000m class, rated 3500–5000m on 114mm pipe (2800–4500m on 127mm) with a 3150kN maximum hook load. The visible change from the ZJ40D is the hoisting geometry: a 6×7 string over φ35mm line, paired with a φ952.5mm (37.5”) rotary table that clears the larger intermediate and production casing strings. Three 1080kW gensets feed an AC-VFD-AC bus driving a 1100kW (1500hp) drawworks, and circulation keeps two 1300hp pumps but grows to ≥320m³ of effective mud volume. A 45m K-type mast stands on a 9m drilling floor, the configuration selected for deep exploration, mature-field deepening and super-deep geothermal fixed stations.

Core advantages

Designed around the operating requirement.

3150kN hook on a 6×7 string

The 3150kN maximum hook load is carried on a 6×7 traveling system with φ35mm drill line, the first move up from the 5×6 string on the ZJ40D. The extra lines and heavier wire rope lift the hook rating for the longer 5000m trips and the heavier casing runs.

φ952.5mm rotary for large casing

A φ952.5mm (37.5”) rotary table opening replaces the φ700mm table of the smaller rigs. That larger clearance is what lets the ZJ50D run the big-diameter intermediate and production casing programs that a 4000m-class table cannot pass.

3×1080kW gensets, 1100kW drawworks

Three 1080kW diesel gensets feed the AC-VFD-AC bus, sized for the 1100kW (1500hp) drawworks. The VFD holds stepless speed on both drawworks and rotary, with the extra generator headroom for the higher hoisting duty.

45m mast on a 9m drilling floor

A 45m K-type derrick mounts on a 9m-high drilling floor. The raised floor leaves room under the rig for the BOP stack and high-pressure lines that grow with well depth, and the taller mast carries the longer stands for faster tripping.

≥320m³ mud plant, two 1300hp pumps

Circulation stays at two 1300hp mud pumps through the Φ102mm / 35MPa manifold, but the solid-control volume grows to ≥320m³. The larger pit volume is needed to condition and weight mud on deeper holes where cuttings loads and downhole pressures rise.

The mid-size deep-well fixed rig

Sitting between the ZJ40D and the 2000hp-class rig, the ZJ50D is chosen when the program calls for 5000m depth and large casing but not the 4500kN hook of the ultra-deep units. Its fixed skid keeps the spread on one location for the deepening and workover cycle.

Product Overview
Product1500HP Skid Mounted Rig (ZJ50D)
Product lineDrilling Rigs
Technical Specifications
Nominal drilling depth (114mm DP)3500~5000mOpen diameter of rotary tableφ952.5mm (37.5”)
(127mm DP)2800~4500mQty.× power of diesel engine3×1080kW
Max. hook load3150kNShift of drawworkstepless speed regulation
Traveling system6×7Height of drilling floor9m
Dia. of Drill lineφ35mmMast model and heightK type, 45m
Qty.× power of mud pump2×1300hpDrawworks power1100kW (1500hp)
Transmission typeAC-VFD-ACMud high pressure manifoldΦ102mm (dia) ×35MPa
Shift of rotary table1 shift stepless speed regulations Effective capacity of mud tank of solid control system≥320m3
Application

Where this equipment is used.

  • Fixed-station drilling to 3500–5000 m on 114 mm pipe, or 2800–4500 m on 127 mm pipe, with a 3150 kN hook on a 6×7 string.
  • Long-term development and secondary-recovery programmes where the rig stays on one location and the AC-VFD-AC drive sustains continuous duty.
  • Deep well completion, renovation and workover on the same location, using the 45 m K-type mast and 9 m floor.
  • Large casing programmes through the φ952.5 mm rotary table and ≥320 m³ mud system.
  • Mature-field capacity expansion and deepening projects on established pads.
  • Fixed-site operation in desert, Gobi and high-altitude bases, with climate provisions configured at order time.
Next step

Send the operating requirement.

For a useful technical response, include the target well conditions, operating depth or pressure, expected quantity, destination and any required configuration.

Send an Inquiry
Configuration

Options for a matched equipment scope.

Available configurations can be matched to the equipment model, operating conditions and project requirements.

  • Hook and hoist margin: confirm the 3150 kN rating, 6×7 line arrangement and 45 m mast static load against the planned casing programme.
  • Circulating scope: mud pump power and tank capacity set against the drilling-fluid programme and well depth.
  • Power plant: generator configuration and any grid or emission requirements matched to the site.
  • foundation: skid layout, substructure clearance and anchoring confirmed against the site pad.
  • Cold-climate fit for 1500HP Skid Mounted Rig (ZJ50D): low-temperature start, heat preservation and coating confirmed against the operating site.
  • Paperwork and training for 1500HP Skid Mounted Rig (ZJ50D): manuals, factory test report and first-period spares ship with the unit; commissioning and familiarization on request.
Buyer questions

Frequently asked about this equipment.

Questions about the 1500HP ZJ50D class usually begin with its 3,500-5,000 m envelope and the 5×6 traveling system.

What core upgrades does the 1500HP ZJ50D rig have compared with the 1000HP model?

The step from the ZJ40D to the ZJ50D is the hoisting geometry and the power bus: the hook rises to 3150 kN on a 6×7 string over φ35 mm line, the rotary table opens to φ952.5 mm (37.5″) to clear larger intermediate and production casing, and three 1080 kW gensets feed a 1100 kW AC-VFD-AC drawworks. The drilling envelope moves to 3500–5000 m on 114 mm pipe (2800–4500 m on 127 mm), against the 4000 m-class rating of the ZJ40D, which is the practical difference in deep-well construction programs.

Is the modular skid structure easy to install and debug?

Modules leave the factory pre-mated and pre-commissioned, so site work is foundation preparation, skid-to-skid alignment, and hooking up the VFD bus, the two 1300hp pumps and the ≥320m³ pits. Because the 6×7 hoist and 1100kW drawworks are already proof-tested, commissioning is a short re-check rather than a full field assembly.

What dual functions does this flagship rig integrate?

Drilling and deep workover share the same 3150kN hoisting envelope. In drilling duty the rig makes hole to 3500–5000m on 114mm pipe; in workover duty the 6×7 string, φ952.5mm rotary and 45m mast handle deep repairs, large-casing pulls and fishing on wells beyond the 4000m-class rigs.

Can it operate stably in extreme harsh oilfield environments?

The enclosed, climate-controlled VFD cabin is the main climate control; the three 1080kW gensets carry cold-start and dust systems, and the ≥320m³ mud plant can be fitted with heated tank options to keep circulation running in low-temperature spells. For hot desert duty the drive-room ventilation and radiators are rated for sustained full load.

What support does the factory provide for the 1500HP Skid Mounted Rig (ZJ50D)?

Each unit ships with the VFD manual, the 3150kN hoist test report and the mud-plant hydrotest record, plus a recommended spare list for the first operating period. Remote technical guidance is free, and the 1100kW drawworks and 3×1080kW gensets follow one parts catalog. For deep-well projects, our engineers can supervise commissioning and train operators on site.

Procurement information

Ordering this equipment.

Commercial terms are confirmed in the quotation for the exact configuration, quantity and destination.

Certification & standards

Complying strictly with API 4F and global petroleum machinery industry standards, it is specially developed for large-scale oilfield deep-well exploration & development, mature oilfield secondary capacity expansion and super-deep geothermal engineering project. The derrick and substructure are load-tested to their rated capacities at the Jingzhou plant under ISO 9001:2015 quality management, and the full rig undergoes a factory acceptance test before shipment.

Documentation

Drilling manuals, rig inspection reports and load-test certificates are supplied; the skid dimensions and manifold drawings are provided for site integration. Rig-up supervision is available.

Lead time

Confirmed in the quotation according to configuration, quantity and destination.

Warranty & after-sales

Manuals, conventional spare parts and remote technical guidance are included; on-site commissioning and operator training can be arranged on request.

Payment & delivery

Payment schedule, Incoterms, port and packaging are agreed in the sales contract.

Spare parts

A recommended spare-parts list for the first operating period is provided with the quotation.